ApartmentsFull dossier

Lumi Hanoi

Follow Lumi by precinct and milestone: construction, fit-out, handover and operation. Progress reporting helps frame timely questions; unit plans help explore daily use. Neither replaces the documents for the particular apartment.

Compare
Developer named by the source
CapitaLand Development
Project type
Apartment development
Status per the source
July 2026 construction update available; individual handovers unconfirmed.
Sources read
Review before

What HAVO has, and what is missing

Each status describes HAVO's data, not the quality of the project.

Observed asking pricesNot verified

Historic advertised prices are not treated as current prices.

Legal documentsNot verified

HAVO has not collected enough documents from competent authorities.

Living conditionsPartly sourced

Landscape and connectivity information currently comes only from CapitaLand.

Building operationsNot verified

The project is under development, so stable operating data is not available.

What the sources say

Each line links to its source. Developer material is still the developer's claim.

Published location

C3-CH01-1 Tay Mo - Dai Mo - Vinhomes Park, Hanoi

Source: CapitaLand Development

Apartment scale

About 4,000 units

Source: CapitaLand Development

Towers and height

9 towers, 29-35 storeys

Source: CapitaLand Development

Published unit sizes

42-135 sqm for 1-4 bedroom units, plus duplexes and penthouses

Source: CapitaLand Development

Notes for your viewing

Living context read from public sources. The date a source was read is not a site visit. Checked .

Read July progress by precinct

July 2026: Prestige/Elite architectural works complete, fit-out at level 27; Signature finishing.

This is the developer's reporting period. Its forward-looking September milestone is not evidence that handover occurred; request the actual unit's notice and documents.

Ask at the viewingIs there a post-July update and handover documentation for my tower and unit?

Date in the source: 2026-07 · Source: CapitaLand Development

Latest inspected entry labelled July 2026; archive includes October 2025. These are reporting periods, not inferred publication days.

Topping out is not a move-in date

CapitaLand's archive records nine towers topping out in October 2025.

Keep this in the history, not as a current operating label. For moving plans, separate building work, contractual handover and access to amenities.

Ask at the viewingBeyond topping out, which documents and items need confirmation before my intended move?

Date in the source: 2025-10 · Source: CapitaLand Development

Latest inspected entry labelled July 2026; archive includes October 2025. These are reporting periods, not inferred publication days.

Two area labels on one selection

The inspected initial selection displays NFA 42.2 m² and GFA 46.2 m².

This is an area-label exercise, not the size of every Lumi unit. Record version, tower, unit code and definitions in the transaction document; keep the image at its source.

Ask at the viewingWhich area basis does this unit's contract use, and which layout version is attached?

Source: CapitaLand Development

Only the initially displayed selection was read; selectors may change.

How the developer describes life here

These come from marketing material. HAVO has not verified them and does not turn them into a score.

  • Developer claim

    CapitaLand describes a central park, elevated boardwalk and on-site facilities.

  • Developer claim

    The stated 20-minute trip to the CBD is marketing information and depends on traffic.

Questions to take with you

Ask about the exact unit and tower you are viewing, not the project as a whole.

  1. What are the current progress, handover schedule and sale eligibility for each phase?
  2. Which documents will confirm the expected management fee and operator?
  3. Is the unit in Signature, Prestige or Elite, in which tower and code, and which progress document covers it?
  4. Is the stated milestone a target, readiness notice or the unit's actual handover record?
  5. If viewing is permitted, am I seeing a show unit or the actual apartment, and which items remain inaccessible?
  6. Which documents state the schedule, fees, operator and facility access when this unit is handed over?

Sources opened and read

Have a newer source, or spotted an error?

Send the type of information and a short note. Do not send unit numbers, ID documents, contracts or personal data.

HAVO reads the source before changing anything. What you send is not published.

Read before deciding

Apartment area

Net and gross apartment area: compare the right number

Two apartments can carry the same price-per-square-metre label while using different area bases. Before deciding which offers better value, make the denominator visible. Then separate space inside the unit from shared facilities, access permissions and charges that need their own documents.

3 min read
Reading space

Read an apartment layout through an ordinary family day

Turn furniture symbols into people doing ordinary things: arriving, cooking, working, resting and doing laundry. The question is not whether the drawing looks luxurious, but whether the particular apartment supports your household's routines.

3 min read